Kristin

Client: Statoil ASA (now Equinor)
When: 2007
Location: Norway
  • Installation and recovery of 8” temporary loading system hose from semi-submersible to tanker Navion Britannia, length 550 m
  • Installation and removal of similar 8” temporary loading system hose
  • Water depth 370 m
  • Fast track project, about 2 months from call-off to completion
  • Project management & Engineering