Explore our projects

Explore a selection of our finished worldwide projects

Scope of Work

Lump sum contract for: Installation and simultaneous burial of a 170 km fibre-optic cable between Denmark and Norway/Engineering/Logistics & transport/Inshore & diving operations

Client

Skagenfiber

When

2020

Location

Norway / Denmark

Scope of Work

Lump sum contract for: Installation and simultaneous burial of a 170 km fibre optic cable between the Norway and Denmark/Engineering/Logistics and Transport/Beach pull at both ends/Testing

Client

Bulk Infrastructure

When

2021

Location

Denmark / Norway

Scope of Work

Lump sum contract for: Installation and simultaneous burial of a 200 km fibre optic cable between the UK and Netherlands/Engineering/Logistics and Transport/Cable Crossings/Jointing and testing.

Client

EU Networks

When

2021

Location

Netherlands / UK

Scope of Work

Lump sum contract for: Upending, installation and piling of platform jacket/Installation & welding of topsides to jacket/Installation of flexible flowline riser/Installation of CALM buoy & all related anchors & mooring legs/All related engineering and transport of structures & equipment.

Client

Sarost SA

When

2017

Location

Tunisia

Scope of Work

Lump- and provisional sum contract for the removal and decommissioning of deepwater subsea equipment: 9 x flexible risers/1 x dynamic umbilical/All buoyancy elements/FPSO mooring lines/Submerged STP buoy/All related engineering & logistics.

Client

Aker Floating Production

When

2020

Location

India

Scope of Work

Lump sum contract for: Contracting of multiple vessel installation spread/Pre-tensioning works 16x mooring lines/Installation of FPSO/Engineering/Logistics & transport.

Client

Yinson / First Exploration & Production

When

2020

Location

Turkey

Scope of Work

Installation of 3 x 4” gas risers to FPSO/Installation 3 x3km gas lift pipelines/Flowline stabilisation with concrete mattresses/Project management and engineering.

Client

Sonangol / Angola Drilling Company

When

2004–2005

Location

Angola

Scope of Work

Procurement & transport of 45 km rigid linepipe (API 5L X52)/Onshore fabrication of triple joints/Offshore installation of 34 km of 6” pipeline/Offshore installation of 11 km of 4.5” pipeline/Project management and engineering.

Client

Sonangol / Angola Drilling Company

When

2005–2006

Location

Angola

Scope of Work

Offshore installation of 2x utility umbilicals between Morsa West & satellites, total 10 km/Offshore installation of 5x power cables between Morsa West & satellites, total 25 km/Project management and engineering.

Client

Sonangol / Angola Drilling Company

When

2006–2007

Location

Angola

Scope of Work

Procurement & transport of 26 km rigid linepipe (API 5L X65)/Onshore fabrication of triple joints/Offshore installation of 20 km of 6” pipeline/Offshore installation of 6 km of 4.5” pipeline/Project management and engineering.

Client

Sonangol / Angola Drilling Company

When

2007–2008

Location

Angola

Scope of Work

Offshore installation of 4” gas lift production flowline from FPSO to WHP, length 800 m/Offshore installation of 6” test production flowline from FPSO to WHP, length 800 m/Offshore installation of 8” main production flowline from FPSO to WHP, length 800 m/Project management and engineering.

Client

Deepflex / Afren

When

2007–2008

Location

Turkey

Scope of Work

Installation and recovery of 8” temporary loading system hose from semi-submersible to tanker Navion Britannia, length 550 m/Installation and removal of similar 8” temporary loading system hose/Water depth 370 m/Fast track project, about 2 months from call-off to completion/Project management & Engineering.

Client

Statoil ASA (now Equinor)

When

2007

Location

Norway

Scope of Work

Procurement & transport of 8 km rigid linepipe (API 5L X65)/Onshore fabrication of triple joints/Procurement of pig launchers, pig receivers and all temporary installation aids/Offshore installation of 8 km of 10” rigid pipeline/Project management and engineering.

Client

Sonangol / Angola Drilling Company

When

2008–2009

Location

Angola

Scope of Work

Installation and recovery of 8” temporary loading system hose from semi-submersible to tanker Navion Britannia, length 550 m/Installation and removal of similar 8” temporary loading system hose/Water depth 370 m/Project management & Engineering.

Client

Statoil ASA (now Equinor)

When

2008

Location

Norway

Scope of Work

Lump sum contract for: Offshore installation of 4x 6” production risers/flowlines from FPSO to wellheads/Offshore installation of 4x control umbilicals/risers from FPSO to wellheads/Water depth 140 m/Project management and engineering.

Client

Addax Petroleum Exploration (Turkey) Ltd.

When

2012

Location

Turkey

Scope of Work

Recovery of 2x 6” flexible flowlines and re-lay in new corridors/Recovery of 2 umbilicals and re-lay in new corridors/Procurement of required temporary items/Project management and engineering.

Client

HydroDive Turkey Ltd / Kaztec / Addax Petroleum

When

2013

Location

Turkey

Scope of Work

Lump Sum contract for: Replaced 6x 130 m anchor chains/Chain inspection/Hook-up of intermediate FSO/Disconnection of electrical cable/Disconnection of 20” and 10” risers/Disconnection of the Ifrikia II FSO/Project management and engineering.

Client

Sarost SA / Serept

When

2015

Location

Tunisia

Scope of Work

Installation & connection of multiple 24 kV and 52 kV subsea electrical cable to a subsea marine substation and subsea connection box/Installation of subsea fibre cable/Installation of subsea generator cable/Project management & Engineering.

Client

Seabased Industy AB

When

2015

Location

Sweden

Scope of Work

Heavy lift transport of an offshore construction vessel/Contracting of Heavy Lift Vessel/Seafastening calculations/Stability assessment/Project management, engineering and on-site supervision.

Client

Rever Offshore AS

When

2016–2017

Location

Canada to Bulgaria

Scope of Work

Lump Sum contract for: Power cable recovery/Power cable onshore trans-spooling/Project management & Engineering.

Client

Prismian

When

2019

Location

Germany

Scope of Work

Lump sum contract for: Contracting & mobilisation of mooring spread/Installation & pre-tension of 16 anchors, catenaries & mooring lines/Project management and engineering.

Client

Yinson / First Exploration & Production

When

2020

Location

Turkey

Scope of Work

Disconnection and inspection of the permanent mooring chains on the FPSO Adoo/Chains reconnected to FPSO/Project management and engineering.

Client

Yinson / First Exploration & Production

When

2020

Location

Turkey